Europe | Switzerland | 184.1 km | 114.3 mi |
Asia | South Korea | 448.0 km | 278.3 mi |
North America | USA | 55.2 km | 34.3 mi |
South America | Brazil + Peru | 30.8 km | 19.2 mi |
Africa | South Africa | 21.2 km | 13.2 mi |
Total length | 1031.7 km | 640.6 mi |
Country: Switzerland
City: Link through the alps between Erstfeld and Bodio
Line: Zurich - Milano
Operating company: Swiss Federal Railways
Length of track construction: 114 km (57 km double line) / 70.7 mi (35.4 mi double line)
Axle load: 25 t (27.5 US t)
Design velocity: 250 km/h (155 mph)
Special feature: The Gotthard base tunnel is the longest railway tunnel in the world. Track construction takes place from September 2010 to 2015.
Photo: ARGE Fahrbahn Transtec Gotthard / By courtesy of Alp Transit Gotthard AG and ARGE Fahrbahn Transtec Gotthard
Country: Korea
City: Seoul
Line: Gimpo-Seoul
Operating company: AREX
Length of track construction: 28 km (17.4 mi)
Design velocity: 120 km/h (75 mph)
Special feature: The LVT installation took place from February to July 2009. The contractor worked in three shifts in five divided sections to meet the client's time requirements.
Country: Sweden
City: Malmö
Operating company: Banverket
Length of track construction: 12 km (7.5 mi)
Axle load: 19 t (21 US t)
Design velocity: 160 km/h (100 mph)
Special feature: With the installation of the
LVT high attenuation (LVT HA) system, the high requirements on vibration attenuation for this project could be fulfilled.
SONNEVILLE AG
Industriezone 2
3225 Müntschemier
Switzerland
Tel. +41 32 312 98 50
Fax +41 32 312 98 88
E-mail mail sonneville.com
© 2010 sonneville
Video